|
Figure 5. During construction of the shallow trench interceptor and sumps on the Cherry Farm Site, LNAPL was discovered. Therefore, a field change was made to route the River Road recovery wells and the entire shallow trench discharge to the oil removal process. This is a process flow diagram for the treatment plant as it was constructed.