Extraordinary estuary

Mapping the Hudson Estuary's submerged lands, JW Ladd et al.

PCBs in the Hudson River: Role of sediments, EA Garvey et al.

Hudson River restoration: Role of natural resources trustees, TM Brosnan et al.

Ecosystem indicators for Lake Ontario, F Luckey et al.

Effect of lower chlorine dosage at Buffalo WWTP, KN Irvine et al.

Livestock waste management and lake rehabilitation, CB Lind

President's message

Executive director's message

Plant profiles
   Southtowns STP
   Big Sisters STP
   Lacawana STP
   Holland TP

People and places


      Spring 2002 — Vol. 32, No. 1

Holland Treatment Plant
 
457 N. Main St., Holland, NY 14080
 
A Public facility serving 1,750
 
Design flow: 0.18 MGD
Average flow: 0.086 MGD
 
Service area has 250 grinder units, RBCs enclosed in main building

Treatment
BOD: 127
TSS 136
Treatment units
Pretreatment-equalization basin (aerated), primary clarifiers, rotating biological contactors, Secondary clarification, sand filtration, UV light disinfection, aerobic digestion, drying beds
 
Plant performance

 
Unique processes
Conversion of Cl2 gas to UV light for disinfection
Personnel
Employees: 2 operators
Certification and training: (1)-3A NYSDEC operator full time, (1)-2A NYSDEC operator full time, (1)-4A part time
Programs
Safety: Respirator fit, CPR first aid, HazMat, emergency response, risk management, SARA Title 3
 
Industrial pretreatment: yes
Facility
Date built: 1981
Upgraded:
Consulting or design engineers: URS Corporation
Contact: Mike Walker, Pat Hall
Telephone: 716-537-9049
Fax:
No web site.

   
Home | Masthead | Author's guide | Scholarship fund | Plant profiles
Executive Director     Editor     Webmaster
To speak with a representative: 315-422-7811